Home | Site map | Terms of use | VSL on the web | Careers | Contact Us
Search:

Welcome to VSL International Ltd.

VSL Website
VSL at the Ritz in Dubai
VSL Middle East is nearing completion of post-tensioning works at the Ritz Carlton Hotel & Apartments project in Dubai. The project consists of 15 levels of post-tensioned flat slabs, with a total PT floor area of about 80,000m². More than 550t of 0.63" diameter strand will be used.
 
Soaring core
VSL's Climbform has reached the top of the 300m-high One Island East building in Hong Kong. A 4-day climbing cycle was achieved for the total operation whose area totals 141,000m². VSL was also awarded the design, supply and installation for 66 post-tensioned floors, totalling 112,000m².
 
Sea-water pipeline in Morocco
VSL Switzerland has completed the installation of 300t of post-tensioning at the Jorf Lasfar site. The 300mm-thick prestressed concrete pipeline was post-tensioned transversely and longitudinally using VSL6-1 and EC6-12 anchorages respectively.
 

SYSTEMS
BROCHURE
  
Other brochures

LATEST
NEWS MAG
  
Previous issues
 


© 2008 Welcome to VSL International Ltd.

VSL International Ltd. / CH-053.3.001.465-2