 | VSL has successfully transported a 2,500t tunnel boring machine 625m overland to its next location in Biel, Switzerland. Client Herrenknecht opted to move it in one piece rather than dismantle it. The move to the next drilling location required the development of a completely new sliding procedure. |
|